12021 Train Schedule | Train Time Table

Train Number
HOWRAH-BARABIL JAN SHATAB Kolkata Howrah Junction to Barbil
Book Tickets Now
STATION NAME STATION CODE ARRIVAL HALT TIME
In Mins
DEPARTURE DAYS DISTANCE
In KMs
Howrah Jn HWH
Average Delay: (NULL min)
06:20
Average Delay: (1 min)
1 0.0
Kharagpur Jn KGP 08:00
Average Delay: (0 min)
2m 08:02
Average Delay: (2 min)
1 115.0
Ghatsila GTS 09:12
Average Delay: (0 min)
1m 09:13
Average Delay: (2 min)
1 212.4
Tatanagar Jn TATA 09:58
Average Delay: (3 min)
10m 10:08
Average Delay: (2 min)
1 248.6
Sini Jn SINI 10:33
Average Delay: (3 min)
1m 10:34
Average Delay: (4 min)
1 275.3
Chaibasa CBSA 11:07
Average Delay: (11 min)
1m 11:08
Average Delay: (12 min)
1 310.9
Dangoaposi DPS 11:54
Average Delay: (19 min)
2m 11:56
Average Delay: (20 min)
1 365.6
Noamundi NOMD 12:19
Average Delay: (19 min)
1m 12:20
Average Delay: (20 min)
1 373.4
Bara Jamda Jn BJMD 12:40
Average Delay: (10 min)
2m 12:42
Average Delay: (10 min)
1 387.3
Barbil BBN 13:05
Average Delay: (0 min)

Average Delay: (0 min)
1 396.6

About Train 12021 HOWRAH-BARABIL JAN SHATAB

Train 12021 HOWRAH-BARABIL JAN SHATAB runs from Kolkata Howrah Junction(HWH) to Barbil(BBN) on Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, Sunday. Train departs from Kolkata Howrah Junction(HWH) at 06:20 and reaches Barbil(BBN) at 13:05. It takes 1 day to reach train 12021 from Kolkata Howrah Junction(HWH) to Barbil(BBN) .

HOWRAH-BARABIL JAN SHATAB 12021 train passes through 10 major stations in 1 day to reach from Kolkata Howrah Junction to Barbil . It takes total of 6:45 hours journey to reach Barbil .

In 12021 train route maximum halt time for this train is 10 minutes at Tatanagar Jn(TATA). Train 12021 arrives at Tatanagar Jn at 09:58 and departs at 10:08. So if you want to get down from the train and buy anything from the station or for little fresh air. It's safe to get down at this station.


12021 HOWRAH-BARABIL JAN SHATAB FAQ

From which station train 12021 HOWRAH-BARABIL JAN SHATAB starts from?

12021 HOWRAH-BARABIL JAN SHATAB starts from Kolkata Howrah Junction(HWH)

How many days in a week 12021 HOWRAH-BARABIL JAN SHATAB runs ?

12021 HOWRAH-BARABIL JAN SHATAB runs on Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, Sunday,

What is the maximum halt time of 12021 HOWRAH-BARABIL JAN SHATAB and at which station?

Maximum halt time of 12021 HOWRAH-BARABIL JAN SHATAB train is 10 minutes at Tatanagar Jn(TATA)

Top Train Routes related to 12021 HOWRAH-BARABIL JAN SHATAB

For more information on 12021 HOWRAH-BARABIL JAN SHATAB train Click IRCTC