GNT-BZA (77289)
0 /5 ( 0 reviews)STATION NAME | STATION CODE | ARRIVAL |
HALT TIME
In Mins |
DEPARTURE | DAYS |
DISTANCE
In KMs |
---|---|---|---|---|---|---|
Guntur Jn | GNT |
Average Delay: (- min) |
06:20 Average Delay: (3 min) |
1 | 0.0 | |
Pedakakani Halt | PDKN |
06:27 Average Delay: (- min) |
1m |
06:28 Average Delay: (- min) |
1 | 6.8 |
Namburu | NBR |
06:34 Average Delay: (21 min) |
1m |
06:35 Average Delay: (21 min) |
1 | 8.8 |
Mangalagiri | MAG |
06:48 Average Delay: (18 min) |
1m |
06:49 Average Delay: (18 min) |
1 | 20.2 |
Krishna Canal Jn | KCC |
07:04 Average Delay: (01:03 min) |
1m |
07:05 Average Delay: (01:03 min) |
1 | 27.0 |
Vijayawada Jn | BZA |
07:40 Average Delay: (11 min) |
Average Delay: (- min) |
1 | 31.9 |
For Faster Experience Download App.
About Train 77289 GNT-BZA
Train 77289 GNT-BZA runs from Guntur Junction(GNT) to Vijayawada Junction(BZA) on Train departs from Guntur Junction(GNT) at 06:20 and reaches Vijayawada Junction(BZA) at 07:40. It takes 1 day to reach train 77289 from Guntur Junction(GNT) to Vijayawada Junction(BZA) .
GNT-BZA 77289 train passes through 6 major stations in 1 day to reach from Guntur Junction to Vijayawada Junction . It takes total of 1:20 hours journey to reach Vijayawada Junction .
In 77289 train route maximum halt time for this train is
1 minutes at
Pedakakani Halt(PDKN).
Train 77289 arrives at
Pedakakani Halt
at 06:27 and departs at 06:28. So if you want to get down from the train and buy anything
from the station or for little fresh air. It's safe to get down at this station.