77289 Train Schedule | Train Time Table

Train Number
GNT-BZA Guntur Junction to Vijayawada Junction
Book Tickets Now
STATION NAME STATION CODE ARRIVAL HALT TIME
In Mins
DEPARTURE DAYS DISTANCE
In KMs
Guntur Jn GNT
Average Delay: (- min)
06:20
Average Delay: (3 min)
1 0.0
Pedakakani Halt PDKN 06:27
Average Delay: (- min)
1m 06:28
Average Delay: (- min)
1 6.8
Namburu NBR 06:34
Average Delay: (21 min)
1m 06:35
Average Delay: (21 min)
1 8.8
Mangalagiri MAG 06:48
Average Delay: (18 min)
1m 06:49
Average Delay: (18 min)
1 20.2
Krishna Canal Jn KCC 07:04
Average Delay: (1:03 min)
1m 07:05
Average Delay: (1:03 min)
1 27.0
Vijayawada Jn BZA 07:40
Average Delay: (11 min)

Average Delay: (- min)
1 31.9

About Train 77289 GNT-BZA

Train 77289 GNT-BZA runs from Guntur Junction(GNT) to Vijayawada Junction(BZA) on Train departs from Guntur Junction(GNT) at 06:20 and reaches Vijayawada Junction(BZA) at 07:40. It takes 1 day to reach train 77289 from Guntur Junction(GNT) to Vijayawada Junction(BZA) .

GNT-BZA 77289 train passes through 6 major stations in 1 day to reach from Guntur Junction to Vijayawada Junction . It takes total of 1:20 hours journey to reach Vijayawada Junction .

In 77289 train route maximum halt time for this train is 1 minutes at Pedakakani Halt(PDKN). Train 77289 arrives at Pedakakani Halt at 06:27 and departs at 06:28. So if you want to get down from the train and buy anything from the station or for little fresh air. It's safe to get down at this station.


Top Train Routes