77230 Train Schedule | Train Time Table

Train Number
PASS Guntur Junction to Vijayawada Junction
Book Tickets Now
STATION NAME STATION CODE ARRIVAL HALT TIME
In Mins
DEPARTURE DAYS DISTANCE
In KMs
Guntur Jn GNT
Average Delay: (- min)
20:10
Average Delay: (0 min)
1 0.0
Pedakakani Halt PDKN 20:17
Average Delay: (- min)
1m 20:18
Average Delay: (- min)
1 6.8
Namburu NBR 20:24
Average Delay: (2 min)
1m 20:25
Average Delay: (2 min)
1 8.8
Mangalagiri MAG 20:36
Average Delay: (1 min)
1m 20:37
Average Delay: (1 min)
1 20.2
Krishna Canal Jn KCC 21:03
Average Delay: (0 min)
19m 21:22
Average Delay: (0 min)
1 27.0
Vijayawada Jn BZA 21:35
Average Delay: (2 min)

Average Delay: (- min)
1 31.9

About Train 77230 PASS

Train 77230 PASS runs from Guntur Junction(GNT) to Vijayawada Junction(BZA) on Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, Sunday. Train departs from Guntur Junction(GNT) at 20:10 and reaches Vijayawada Junction(BZA) at 21:35. It takes 1 day to reach train 77230 from Guntur Junction(GNT) to Vijayawada Junction(BZA) .

PASS 77230 train passes through 6 major stations in 1 day to reach from Guntur Junction to Vijayawada Junction . It takes total of 1:25 hours journey to reach Vijayawada Junction .

In 77230 train route maximum halt time for this train is 19 minutes at Krishna Canal Jn(KCC). Train 77230 arrives at Krishna Canal Jn at 21:03 and departs at 21:22. So if you want to get down from the train and buy anything from the station or for little fresh air. It's safe to get down at this station.


Top Train Routes