67274 Train Schedule | Train Time Table

Train Number
PUSHPULL Guntur Junction to Vijayawada Junction
Book Tickets Now
STATION NAME STATION CODE ARRIVAL HALT TIME
In Mins
DEPARTURE DAYS DISTANCE
In KMs
Guntur Jn GNT
Average Delay: (- min)
14:10
Average Delay: (3 min)
1 0.0
Pedakakani Halt PDKN 14:17
Average Delay: (- min)
1m 14:18
Average Delay: (- min)
1 6.8
Namburu NBR 14:24
Average Delay: (9 min)
1m 14:25
Average Delay: (9 min)
1 8.8
Mangalagiri MAG 14:36
Average Delay: (11 min)
1m 14:37
Average Delay: (11 min)
1 20.2
Krishna Canal Jn KCC 14:46
Average Delay: (12 min)
1m 14:47
Average Delay: (14 min)
1 27.0
Vijayawada Jn BZA 15:15
Average Delay: (10 min)

Average Delay: (- min)
1 31.9

About Train 67274 PUSHPULL

Train 67274 PUSHPULL runs from Guntur Junction(GNT) to Vijayawada Junction(BZA) on Train departs from Guntur Junction(GNT) at 14:10 and reaches Vijayawada Junction(BZA) at 15:15. It takes 1 day to reach train 67274 from Guntur Junction(GNT) to Vijayawada Junction(BZA) .

PUSHPULL 67274 train passes through 6 major stations in 1 day to reach from Guntur Junction to Vijayawada Junction . It takes total of 1:5 hours journey to reach Vijayawada Junction .

In 67274 train route maximum halt time for this train is 1 minutes at Pedakakani Halt(PDKN). Train 67274 arrives at Pedakakani Halt at 14:17 and departs at 14:18. So if you want to get down from the train and buy anything from the station or for little fresh air. It's safe to get down at this station.


Top Train Routes