67259 Train Schedule | Train Time Table

Train Number
PUSHPULL Guntur Junction to Vijayawada Junction
Book Tickets Now
STATION NAME STATION CODE ARRIVAL HALT TIME
In Mins
DEPARTURE DAYS DISTANCE
In KMs
Guntur Jn GNT
Average Delay: (- min)
18:30
Average Delay: (0 min)
1 0.0
Pedakakani Halt PDKN 18:37
Average Delay: (- min)
1m 18:38
Average Delay: (- min)
1 6.8
Namburu NBR 18:44
Average Delay: (3 min)
1m 18:45
Average Delay: (3 min)
1 8.8
Mangalagiri MAG 18:56
Average Delay: (4 min)
1m 18:57
Average Delay: (4 min)
1 20.2
Krishna Canal Jn KCC 19:06
Average Delay: (14 min)
1m 19:07
Average Delay: (14 min)
1 27.0
Vijayawada Jn BZA 19:40
Average Delay: (2 min)

Average Delay: (- min)
1 31.9

About Train 67259 PUSHPULL

Train 67259 PUSHPULL runs from Guntur Junction(GNT) to Vijayawada Junction(BZA) on Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, Sunday. Train departs from Guntur Junction(GNT) at 18:30 and reaches Vijayawada Junction(BZA) at 19:40. It takes 1 day to reach train 67259 from Guntur Junction(GNT) to Vijayawada Junction(BZA) .

PUSHPULL 67259 train passes through 6 major stations in 1 day to reach from Guntur Junction to Vijayawada Junction . It takes total of 1:10 hours journey to reach Vijayawada Junction .

In 67259 train route maximum halt time for this train is 1 minutes at Pedakakani Halt(PDKN). Train 67259 arrives at Pedakakani Halt at 18:37 and departs at 18:38. So if you want to get down from the train and buy anything from the station or for little fresh air. It's safe to get down at this station.


Top Train Routes