BZA-TEL (77287)
0 /5 ( 0 reviews)STATION NAME | STATION CODE | ARRIVAL |
HALT TIME
In Mins |
DEPARTURE | DAYS |
DISTANCE
In KMs |
---|---|---|---|---|---|---|
Vijayawada Jn | BZA |
Average Delay: (- min) |
19:25 Average Delay: (1 min) |
1 | 0.0 | |
Krishna Canal Jn | KCC |
19:37 Average Delay: (16 min) |
1m |
19:38 Average Delay: (16 min) |
1 | 4.9 |
Kolanukonda | KAQ |
19:43 Average Delay: (- min) |
1m |
19:44 Average Delay: (- min) |
1 | 8.1 |
Peddavadlapudi | PVD |
19:49 Average Delay: (13 min) |
1m |
19:50 Average Delay: (13 min) |
1 | 12.0 |
Chiluvur | CLVR |
19:55 Average Delay: (- min) |
1m |
19:56 Average Delay: (- min) |
1 | 15.9 |
Duggirala | DIG |
20:01 Average Delay: (17 min) |
1m |
20:02 Average Delay: (17 min) |
1 | 21.6 |
Kolakalur | KLX |
20:07 Average Delay: (- min) |
1m |
20:08 Average Delay: (- min) |
1 | 25.4 |
Tenali Jn | TEL |
20:20 Average Delay: (6 min) |
Average Delay: (- min) |
1 | 31.5 |
For Faster Experience Download App.
About Train 77287 BZA-TEL
Train 77287 BZA-TEL runs from Vijayawada Junction(BZA) to Tenali Junction(TEL) on Train departs from Vijayawada Junction(BZA) at 19:25 and reaches Tenali Junction(TEL) at 20:20. It takes 1 day to reach train 77287 from Vijayawada Junction(BZA) to Tenali Junction(TEL) .
BZA-TEL 77287 train passes through 8 major stations in 1 day to reach from Vijayawada Junction to Tenali Junction . It takes total of 0:55 hours journey to reach Tenali Junction .
In 77287 train route maximum halt time for this train is
1 minutes at
Krishna Canal Jn(KCC).
Train 77287 arrives at
Krishna Canal Jn
at 19:37 and departs at 19:38. So if you want to get down from the train and buy anything
from the station or for little fresh air. It's safe to get down at this station.